Skip to content
Checkout is not configured for this build. Finish Stripe go-live to accept real payments.
30% off ReadyOps systems, bundles, memberships & setup servicesSee sale pricing

Capacity planning

Work center capacity planning without a scheduling engine

Planned hours against available hours, work center by work center, over the next two weeks. It shows you which machine the whole shop is queuing behind before the week starts — then you decide what moves.

An Excel workbook you own, delivered as a download after purchase. No macros, no data connections. The ReadyOps cloud platform is still in development.

Production Control — Shop Overview (sample data)

Open jobs

38

Hours in WIP

412

At risk this week

5

inside 3-day window

Past due

2

JobCustomerPartWork centerDueStatus
J-10428Northline AgBracket, 3/8 plateLaser 1Aug 21On track
J-10431Vance HydraulicsShaft, 4140Turning 2Aug 21At risk
J-10433Cedar FabWeldment, frameWeld 3Aug 24On track
J-10419Trail King RepairPin setGrindAug 18Past due
Illustrative sample data shown for layout purposes.

How it works

The routine, start to finish

  1. 01

    Define the work centers and honest hours

    List each work center and the hours it genuinely delivers in a normal week — after setup, changeover, PM, and shared operators. Conservative numbers are what make the view believable.

  2. 02

    Let the open jobs load it

    Remaining hours on the job list roll up by work center and week. Nothing extra to enter: the load view is a read of the job data you already keep current.

  3. 03

    Act on the one number over 100%

    Resequence a job, add hours, offload an operation, or call the customer early. The view narrows the week down to one or two real decisions.

Scope

What it does, and what it does not

Straight answer before you spend anything. This is a workbook, not a shop system of record.

What it does

  • Sums remaining hours by work center across a short planning horizon
  • Compares that load against the available hours you entered for each work center
  • Shows load as a percentage so an overloaded work center is obvious at a glance
  • Exposes the bottleneck as it moves with the job mix, week to week
  • Ties directly to the same job rows that drive the schedule and at-risk flags

What it does not do

  • Does not sequence operations inside a work center or model queue time between them
  • Does not finite-capacity schedule or auto-level the load
  • Does not fix estimating — if routed hours run low, the load view is optimistic by the same amount
  • Does not track operator skills or shift rosters
  • Does not promise delivery dates automatically

Total shop load is close to useless as a number. A shop at seventy percent overall with the press brake at one hundred and thirty percent is a late shop, and the only way to see that in time is to read capacity one work center at a time on a weekly cycle.

The Production Control System includes the work center load view alongside the job list, at-risk flags, WIP summary, and printable daily schedule, so capacity planning is a by-product of keeping jobs current rather than a separate spreadsheet.

Keep reading

Ready for the full Production Control workbook?

One workbook for job status, work center load, and promise dates. Replaces the whiteboard and the three spreadsheets that never agree.