Skip to content
Checkout is not configured for this build. Finish Stripe go-live to accept real payments.
30% off ReadyOps systems, bundles, memberships & setup servicesSee sale pricing

Free download

The Free Shop Priority Board

One page that answers the three questions every morning meeting starts with: what runs today, what is at risk, and what ships this week. Print it, hang it, work it.

What you get, plainly

One Excel workbook in a ZIP: an empty board plus a filled example copy. No macros, no data connections, no add-ins, nothing to install. It is not a trial, not time-limited, and not a stripped demo of a paid file.

What it is not: it does not track inventory, capacity by work center, PM schedules, or training records, and it is not a shop system of record. Those are the paid systems.

Your email is used to send this file and occasional notes about new ReadyOps systems and platform releases. One-click unsubscribe. We do not sell or share your address.

  • One page that shows what runs today, what is at risk, and what ships this week
  • Works as a printable morning-meeting sheet
  • Same field naming as the paid Production Control System, so upgrading is not a rebuild
  • No macros, no data connections, no email required to open the file

The board is a starting point, not a stripped demo. If it earns its place in your morning meeting, the full Production Control System adds work center load, WIP value, and shipping history on the same field names.

Get the Priority Board

One Excel file. No macros, no data connections, no cost.

Preview

What the board looks like

Layout mockup with illustrative sample data. The file you receive is an empty workbook plus a filled example copy.

Shop Priority Board — Today (sample data)

Open jobs

38

Hours in WIP

412

At risk this week

5

inside 3-day window

Past due

2

JobCustomerPartWork centerDueStatus
J-10428Northline AgBracket, 3/8 plateLaser 1Aug 21On track
J-10431Vance HydraulicsShaft, 4140Turning 2Aug 21At risk
J-10433Cedar FabWeldment, frameWeld 3Aug 24On track
J-10419Trail King RepairPin setGrindAug 18Past due
Illustrative sample data shown for layout purposes.

How to use it

A five-minute daily routine

  1. 01

    Update status once a day

    Mark each job's current work center and status. That is the only entry the board needs.

  2. 02

    Read the flags

    At-risk and past-due rows highlight themselves. Decide what moves before the day starts.

  3. 03

    Print for the meeting

    One page, no scrolling, readable across a table or taped to the wall.

Board working? Add the full system.

Production Control picks up where the board stops: work center load, WIP hours and value, late-job history, and shipping log.